Glossary

Energy efficiency first principle

Under this principle, energy efficiency solutions must be assessed first in policy, planning and major investment decisions, before any expansion of energy supply is considered.

The principle is set out in Article 3 of Directive (EU) 2023/1791 on energy efficiency. Member States ensure that energy efficiency solutions, demand-side resources and system flexibility are assessed in planning, policy and investment decisions affecting the energy system and other sectors that influence energy consumption, and in investments exceeding EUR 100 million per project, or EUR 175 million for transport infrastructure. The cost-benefit analysis must take into account the whole life cycle and the long term.

The Directive’s instruments affecting undertakings are these: those with an average annual energy consumption of more than 85 TJ over the previous three years must implement an energy management system whose conformity with the relevant standards is assessed by an independent body, and those consuming more than 10 TJ must, if they have no such system, undergo an energy audit every four years.

Who it matters to

A large energy-consuming undertaking, a public body or the preparer of a significant investment encounters it when carrying out an energy audit, introducing an energy management system or preparing a cost-benefit analysis for an investment.

Status (21 November 2026): The transposition deadline of the Directive was 11 October 2025; under Article 11, the deadline for the first energy audit was 11 October 2026, and the energy management system must be implemented by 11 October 2027.